Fri 9th December 2016 / 12:45
Concrete is down now and I’m wrapping the edges of the DPM over the riser walls.
The story of my extension being built
Saturday 18 June 2016 / 15:33
The first two slabs laid. They’ve been stacked up in various places for nearly 6 years and now it’s time for them to be cleaned up and resume their life as a patio. Fortunately, whoever laid them originally laid them upside-down, so even though they’re probably 50 years old they look quite new when laid the right way up.
Saturday 6 August 2016 / 15:20
Another hot weekend and the last of the grouting. A dry 1:4 mix is brushed in, tamped down and smoothed with a 27mm dia socket. I got some grey sand from Sydnams to make the mortar for the grout as I preferred the colour. Going for beers and curry with Neil and Tony tonight.