6 Conservatory

Wednesday 3 May 2017 / 18:55

The Neil and Ben have been at it for another day and the brick and block work is coming up. The blocks are the final height now.

7 Conservatory

Thursday 4 May 2017 / 20:08

They’ve finished the brickwork apart from a small triangle top right, which will probably be done when the frame is in.

8 Conservatory

Fri 9 June 2017

Today we cut the template in half and took it to the joinery in William’s van so that they can work to it.

9 Conservatory

21 July 2017 / 14:19

William and Nick have been over to the joinery and picked up some of the wood. This is a small bit.

10 Conservatory

Sun 23 July 2017 / 12:37

Oiling the wood using Danish Wood Oil. It needs 3 oilings before construction.

11 Conservatory

Mon 24 July 2017 / 19:52

Rafters ready for oiling.

12 Conservatory



Saturday 29 July 2017 / 10:16
Yesterday William brought round some more of the wood and I’m getting some oil on it before it rains.

13 Conservatory

Friday 4th August 2017 / 11:39

I got round to William’s yard at 8am to load these two scaffold towers onto the truck. Putting them up was fairly hard work.

14 Conservatory

Friday 4th August 2017 / 15:22

Nick’s been drafted in and we’ve managed to get a steel beam up onto the towers to suspend the block and tackle that we’ll use to lift the side frame into position with. Williams’s got a bandana on.

15 Conservatory


Friday 4th August 2017 / 15:55

Measuring the sill in order to trim to length.

16 Conservatory

Friday 4th August 2017 / 17:10

Drilling pilot holes in uprights prior to putting big coach bolts in from underside of sill.

17 Conservatory

200mm M12 coach bolts for fastening timber together.

18 Conservatory

Friday 4th August 2017 / 18:09

Getting the hoist set up.

19 Conservatory

Friday 4th August 2017 / 18:16

Hoisting the side top beam ready for location onto the uprights.

20 Conservatory

Friday 4th August 2017 / 18:31

Top beam fitted to uprights.

1 3rd room

Saturday 5th November 2016 | 11:30

Removing the old floor boards.

2 3rd bedroom

Sunday 6th November 2016 | 09:37

More floor removal.

3 3rd bedroom

Friday 11th November 2016 | 18:56

I’ve decided to replace all the joists as well as the floor boards, so it’s turned in to a much bigger job.

4 3rd bedroom

25th November 2016 | 11:11

I’m going to lay concrete with a DPM under the floor to keep the damp out, so I’m having a few tonnes of materials delivered to be made into concrete by Nick.