Posted on Floor Friday 7th December 2012 / 18:44 Bath moved to a new position yet again in preparation for work on the last strip of the floor.
Posted on 16 Bathroom 3 Saturday 3rd January 2015 / 19:58 Quite good progress as I’m still on holiday.
Posted on Roof 4 Friday 24th February 2012 / 09:10 Only part of the gable to be tiled and capping tiles to be added and the roof will be done. This weekend I will be cleaning all the old guttering so some of it can be reused. I’ll also paint the facias and soffets with white gloss.
Posted on Stud Walls Saturday 2nd February 2013 / 18:35 The plasterboard will be bent around the round corner very slowly, over a period of days.
Posted on 17 Central heating Monday 9th December 2013 / 15:30 All done, cover on. After about two years of having a cold house it’s warming up and the damp is being driven out.
Posted on Floor Saturday 8th December 2012 / 11:25 Just been to Totton Timber to pick up three more floor joists. This is how you fit 4.8 m into a short wheel base Land Rover.
Posted on 16 Bathroom Sunday 1st June 2014 / 19:22 Bending plasterboard over a period of days for the internal curve in the bathroom.
Posted on Roof – gable Friday 2nd March 2012 / 10:38 Gable end built up with cavity trays and lead flashing. Capping tiles all done.
Posted on 18 Central heating Sunday 22nd December 2013 / 16:31 Lime scale reducer with filling bypass loop fitted.
Posted on Floor Saturday 8th December 2012 / 18:15 The damp proof membrane now covers the last piece of the floor with a temporary hole for the toilet pipe.
Posted on 17 Bathroom Sunday 8th June 2014 / 13:50 Today I’m fitting the new toilet. I’ve taken the old one out and I’m fitting the Versapanel which will go under the toilet to the floor.
Posted on 18 Bathroom Sunday 8th June 2014 / 17:00 Toilet installed. Spacers inserted to allow for height of tiles.
Posted on Floor Sunday 16th December 2012 / 19:45 Starting to board over the joists. That looks like Martin Freeman on the television.