Ben and Orion start attacking the existing drains with an electric percussion hammer. The existing pipes and two inspection chambers are in the way of where the foundation needs to go so must be replaced with a temporary arrangement.
This is Wednesday’s digging, but we’ve had about 30 mm of rain and the site is turning into a quagmire. The corner to the right of the picture has had to be dug to 1.7 m because it’s a few metres away from a cherry tree. There’s a lot of water in the trenches.
You push the Tirfor’s long handle back and forth to inch the cable through the body of the winch, which in this case is pulling the tree over. The idea is to lever the tree over onto its side and then carry on winching it out sideways.