Saturday 12th October 2013 / 12:08
New 9500 btu radiator fitted.
The story of my extension being built
Friday 20th July 2012 / 13:28
William’s got the wood from Totton Timber and we’ve unloaded it. Originally the chipboard was going to float on top of the insulation, but because the area is so large and there will be some point loads, such as stud walls, I’m going to lay joists allowing for 300 mm of insulation to go between. The insulation will go between the joists and the chipboard will still rest on the insulation, but it will be firmer.
So, we’ve got 20 sheets of insulation 2400 x 1200 x 100, 40 sheets of 22 mm chipboard 2400 x 600 and about 60 m of 45 x 95 CLS timber.
Friday 22nd June 2012 / 12:10
Trev and I are tasked with ‘knocking up’ which means mixing the concrete. It’s four shovels of sand and gravel to one of cement. You can get three batches like that in the cement mixer at a time. It’s quite hard work shoveling off the back of the lorry.
We fill a wheel barrow with wet concrete and it gets wheeled in through the front door over wooden boards through the house and then poured in wherever Orion says it should go.
About a third of the final thickness of concrete is put down and then the reinforcing mesh is laid over the top.