Posted on 51 Conservatory Saturday 26th May 2018 / 13:27 Got the Gutter up and linked into the square down pipe.
Posted on 52 Conservatory Monday 28th May 2018 / 12:19 Bank holiday today and I’m starting to get the cables in before putting the insulation down.
Posted on 54 Conservatory Monday 28th May 2018 / 18:09 All the insulation’s down now, including the bit round the edge to stop heat from the slab leaking into the walls.
Posted on 57 Conservatory Sunday 3rd June 2018 / 13:40 Vapour barrier is down and I’ve just started laying out the underfloor heating pipe.
Posted on 58 Conservatory Sunday 3rd June 2018 / 16:46 Just over half the pipes done. There are two circuits.
Posted on 59 Conservatory Sunday 3rd June 2018 / 17:44 All done. Ready to go on holiday to Cornwall tomorrow.
Posted on 60 Conservatory Friday 15th June 2018 / 14:16 Pressurising the under floor heating circuits to 10 bar to check for leaks.
Posted on 61 Conservatory Friday 22nd June 2018 / 09:28 Today we are screening the floor. Nick and I are shovelling, barrowing and general help and Neil and William are doing the clever bit. The screed is pre-mixed. It’s a fairly dry mix.
Posted on 62 Conservatory Friday 22nd June 2018 / 10:06 William and Neil doing the difficult bit. Bits of wood are arranged to get the height right, then taken out and back filled.
Posted on 63 Conservatory Friday 22nd June 2018 / 12:18 Nick and I took William’s truck up to Nursling to pick up some more screed.
Posted on 64 Conservatory Friday 22nd June 2018 / 12:48 Getting towards the end. Hessian laid over the top and sprayed with water to slow down ‘going off’ as the weather it hot.