1 Formwork

formwork for steps

Saturday 12th March 2016 / 13:55

Totton Timber delivered shuttering ply this morning and I’ve made this formwork for the steps. It even has stiffeners. I’m rather proud of it.

2 Formwork

DSC_1287_r

Saturday 12th March 2016 / 13:09

Nipper got covered in saw dust.

3 Formwork

DSC_1292_r

Saturday 12th March 2016 / 14:13

Formwork in position. It will be filled with concrete up the the first step level, then the lid goes on, then the second step is filled. When all set formwork comes off and 450 x 600 slabs will be used to make the treads.

4 Scalpings

DSC_1395

Saturday 30 April 2016 / 16:20

Raising the level with more scalping

5 Steps – concrete

DSC_1396

Sunday 1 May 2016 / 09:35

Getting the formwork anchored in position with DPM in place against the wall ready for concrete to be poured. Some bits of concrete block will reduce the amount of concrete needed.

6 Steps – concrete

DSC_1399 (1)

Sunday 1 May 2016 / 12:00

Concrete poured up to first step and lid on ready for more concrete to create the next step.

8 Steps – slabs

DSC_1404

Saturday 7 May 2016 / 14:10

Shuttering has been taken off and slabs tested for fit.

9 Steps – slabs

DSC_1406

Saturday 7 May 2016 / 16:41

Slabs cemented in position, but not grouted yet.