Formwork in position. It will be filled with concrete up the the first step level, then the lid goes on, then the second step is filled. When all set formwork comes off and 450 x 600 slabs will be used to make the treads.
Getting the formwork anchored in position with DPM in place against the wall ready for concrete to be poured. Some bits of concrete block will reduce the amount of concrete needed.