Preparation

Monday 23rd April 2012 / 19:41

Came home to find this wall had been knocked down in preparation for the installation of steel #3.

Preparation

Tuesday 24th April 2012 / 19:54

Load bearing stud wall and other brickwork removed, acro props taking the load.

Steel 3

Wed 25th April 2012 / 20:05

A milestone has been reached. The final steel (#3) is now in position. Today the padstone on the outside wall was cemented in and the steel beam hoisted into position. It’s been wheeled into position using the custom built trolley (see inset) and then manhandled and hoisted using a chain hoist into position.

Steel 3

Friday 25th April 2012 / 20:06

A chain hoist is hanging from a large piece of wood which is in turn supported by the ceiling joists which have acro props under them

Steel #3

Friday 27th April 2012 / 11:50

All nicely cemented in.