Internal work 1

22 November 2011

I came home today to find that this internal wall between the kitchen and lounge had been knocked down and some acro props inserted. A pier needs to be built at the intersection of the walls to support one end of a steel beam. The beam will extend to the left of the picture as far as the external wall.

Internal work 2

Thursday 16th December 2011

During today part of the kitchen ceiling has been removed in preparation for the insertion of one of the steel beams. It’s amazing what a difference a ceiling makes to the temperature of a room. It’s freezing in here now.

Internal work 4

Saturday 17th December 2011

This bird came to light when the ceiling was being removed. Looks slightly the worse for wear.