Floor

Friday 7th December 2012 / 18:44

Bath moved to a new position yet again in preparation for work on the last strip of the floor.

15 Bathroom

Sunday 1st June 2014 / 19:22

More wadding.

16 Bathroom 3

Saturday 3rd January 2015 / 19:58

Quite good progress as I’m still on holiday.

3 Shower

Sunday 8th August 2014 / 1651

Attaching Versapanel to wall above bath.

Roof 4

Friday 24th February 2012 / 09:10

Only part of  the gable to be tiled and capping tiles to be added and the roof will be done.

This weekend I will be cleaning all the old guttering so some of it can be reused. I’ll also paint the facias and soffets with white gloss.

Stud Walls

Saturday 2nd February 2013 / 18:35

The plasterboard will be bent around the round corner very slowly, over a period of days.

17 Central heating

Monday 9th December 2013 / 15:30

All done, cover on. After about two years of having a cold house it’s warming up and the damp is being driven out.

Floor

Saturday 8th December 2012 / 11:25

Just been to Totton Timber to pick up three more floor joists. This is how you fit 4.8 m into a short wheel base Land Rover.

16 Bathroom

Sunday 1st June 2014 / 19:22

Bending plasterboard over a period of days for the internal curve in the bathroom.

Roof – gable

Friday 2nd March 2012 / 10:38

Gable end built up with cavity trays and lead flashing. Capping tiles all done.

17 Bathroom 3

Sunday 4th January 2015 / 11:32

Toilet disconnected whilst tiling behind.

18 Central heating

Sunday 22nd December 2013 / 16:31

Lime scale reducer with filling bypass loop fitted.

Floor

Saturday 8th December 2012 / 18:15

The damp proof membrane now covers the last piece of the floor with a temporary hole for the toilet pipe.

17 Bathroom

Sunday 8th June 2014 / 13:50

Today I’m fitting the new toilet. I’ve taken the old one out and I’m fitting the Versapanel which will go under the toilet to the floor.

18 Bathroom 3

Sunday 4th January 2015 / 15:02

Toilet connected again.

Floor

Sunday 16th December 2012 / 19:45

The last joists and insulation are done.

18 Bathroom

Sunday 8th June 2014 / 17:00

Toilet installed. Spacers inserted to allow for height of tiles.

19 Bathroom 3

Saturday 10th January 2015 / 10:34

Tiling upside down is never easy.

Floor

Sunday 16th December 2012 / 19:45

Starting to board over the joists. That looks like Martin Freeman on the television.

20 Bathroom 3

Saturday, 17 January 2015 / 18:06

Starting to tile the shower.