Saturday 5th May 2012 / 16:16
Michelle, Benjamin and Matthew have come round to review progress.
The story of my extension being built
Friday 16th May 2014 / 11:03
The first order of Versapanel has arrived. I’m using it instead of plasterboard in the bathroom and as a tile backerboard for the floor (where there are to be tiles). It’s 10 mm thick, impervious to water and bloody heavy – about 40kg per sheet, so Nick Morgan has turned up to help me move it all and have a cuppa.
Slightly worrying to see that the previous post was in February. It’s not that I haven’t been doing anything, but there have been bits of electrical stuff, which isn’t very photogenic and apart from that I really don’t know where the time has gone. If I’m not careful I won’t get the floors tiled before my birthday.
Saturday 2nd November 2013 / 20:10
Working quite late this evening before going for a beer with Tony in the Peg. I’ve left the pipes long and made a temporary connector between the water supply and the central heating flow pipe. This will enable me to test the whole system using mains water pressure to make sure it doesn’t leak. Normally you’d use a proper pressure testing kit for this, but I reckon this will work pretty well as the mains water pressure should be at least double what the heating system will run at.