8 Central heating

Saturday 2nd November 2013 / 18:35

This filter will need to go on the heating return pipe to remove debris so that it doesn’t get in the boiler. It uses a centrifugal process and a powerful magnet.

Wall below dismantled chimney 1

Sunday 28th October 2012 / 17:24

This bit of wall used to be part of the chimney, which was dismantled. I’ve spent hours chiseling away at the very hard concrete lintel and cutting the reinforcement bars off to get it flush to the wall.

Floor – insulation

Saturday 13th October 2012 / 13:36

Insulation is cut and fittedĀ  between joists.

6 Plastering

Wednesday 4th September 2013 / 0726

Some walls plastered now.

8 Door

Sunday 12th April 2015 / 19:15

This weekend, amongst other things, such as getting my hair cut, I’ve hung this door and fitted the door furniture. The door came from Wickes and it’s a Denham Oak Veneer interior door. It’s nice outside, so I’ve been filling holes with gravel by the side of the house.

8 Bathroom 4

Sunday 22nd March 2015 / 19:58

The Godmorgon is installed.

Concrete

Monday 19th March 2012 / 20:45

More concrete has been added today.

7 Bathroom

Sunday 2nd February 2014 / 17:19

Heated towel rail plumbed in this weekend.

8 Bathroom 3

Saturday 29th November 2014 / 10:27

This week I’ve decided to put the lights in the ceiling to replace the temporary single pendant light that’s been swinging around for ages. I started with three of these, but then added another two and then another above the shower to get the right light level. Sally’s party in the evening.

7 Floor tiling

Sunday 14th September 2014 / 2018

Mostly done.

Steel 3

Friday 24th February 2012 / 10:10

Steel #2 bolts to a welded plate on the end of steel #1 with the far end resting on the padstone in the previous picture.

Roof 4

Friday 17th February 2012 / 16:00

Gary mixing mortar for the capping tiles. It has a black colour additive to darken it.

Stud work

Sunday 6th January 2013 / 13:00

18mm plywood is screwed to the wall. This means you can screw into the wall at any point as well as adding a bit more strength and sound proofing.

9 Central heating

Saturday 2nd November 2013 / 19:28

Pipes bent and soldered, and filter fitted.

Wall below dismantled chimney 2

Sunday 28th October 2012 / 19:34

Brickwork re built. Time to get the wood burner going and have something to eat.

Floor – moving sink 1

Friday 26th October 2012 / 13:01

The sink’s been in the middle of the room for some months now and now the time’s come to work on the next section of the floor it’s going to have to move. I’ve put in the new plumbing ready for it so the old pipes which came down from the ceiling can now be dismantled.