Saturday, 4 September 2010 / 14:06
All concrete has now been poured. The grab lorry was here at 7.15 this morning clunking and scraping away at the pile of clay in the front garden. There’s still a good lorry load left to be taken away. At 9.30 New Forest Hire came to pick up the digger and the dumper truck.
There’s a bit of cleaning up to be done, which I’ll do today.
This aerial shot was taken by holding the camera up on the end of a pole after setting the camera’s time delay to 10 seconds.