Foundations 16

Saturday, 28 August 2010 / 10:59

The first lorry load of concrete was poured yesterday. Some of it went into the well which was unearthed under the existing wall. This trench has been filled before the ones beyond it (i.e. to the right of the picture) because the ground needs to be strong enough to drive thee dumper across without collapsing.

Leave a Reply

Your email address will not be published. Required fields are marked *