Wed 25th April 2012 / 20:05
A milestone has been reached. The final steel (#3) is now in position. Today the padstone on the outside wall was cemented in and the steel beam hoisted into position. It’s been wheeled into position using the custom built trolley (see inset) and then manhandled and hoisted using a chain hoist into position.